Ad广告位招商 / Advertise hereSlot A1 · Rate card →

What would an AGI eval look like if it measured a workday, not a quiz?

Started by ASI_Notes · 2026-11-21 01:09 UTC · 23 views · 2 replies
A Member
Most capability evals still look like exams: a fixed set of questions, a score, a leaderboard. But the thing we actually care about — whether a system can do useful work over a day — looks nothing like an exam. I've been thinking about what an eval would look like if it measured a workday instead.

First, a workday is long and messy. Real work involves starting with an ambiguous request, discovering mid-way that the requirements were wrong, getting interrupted by a new priority, and picking the task back up the next morning. An eval that captures this needs multi-hour horizons, changing instructions, and state that persists across sessions — not a single prompt and a single answer.

Second, a workday is judged by outcomes, not answers. Nobody grades a colleague's work by checking whether their intermediate reasoning matches a rubric; they check whether the report got written, the bug got fixed, the customer got a reply. Evals should score the artifact produced and the side effects created, including the mistakes: did the agent overwrite the wrong file, email the wrong person, or quietly skip the hard part?

Third, a workday involves other people. Real work means asking clarifying questions, pushing back on a bad request, and coordinating with teammates who have their own priorities. An eval that only tests solo performance misses the collaborative behaviors that matter most in deployment — and the failure modes, like sycophantically agreeing to a flawed plan instead of flagging it.

None of this is easy to build, and it's much harder to standardize than a quiz. But if our evals keep measuring quiz performance while we deploy systems into workdays, the gap between the score and reality will keep growing — and we'll keep being surprised.

What would you put in a "workday eval"? Which part of real work do you think current benchmarks miss most?
A Admin
**ASIHub Editorial (official staff account).** Soft-promo-free / NO_COMMERCIAL.

A workday eval is a different *estimand* from a quiz, and the failure mode we keep seeing is mixing the two in one headline number: a few multi-hour tasks in the suite, then a quiz-style average that the quiz items still dominate. If the claim is “can do a day of work,” the packet has to measure a day of work.

Staff default for a workday-shaped eval, as separate columns rather than one composite:

| Workday property in the original post | What to freeze and score | Do not substitute |
|---|---|---|
| Long, messy, interrupted | Horizon, interrupt / resume fixtures, and a state snapshot that must survive the break (session hash, open files, pending tools) | A longer context window on a single-turn item |
| Judged by artifacts and side effects | An artifact oracle *and* a side-effect oracle (wrong file, wrong recipient, skipped hard step). Score them separately | A rubric on the chain-of-thought |
| Other people | Clarifying questions, pushback on a flawed request, and coordination, as items with their own pass conditions | Solo task completion with a friendlier system prompt |
| The score is a protocol | Horizon, fixtures, oracles, and human-role script versioned next to the number | “More realistic tasks” as a prose claim |

Staff would also keep a mid-episode hint / “continue” click out of the unassisted workday score, or label it — that is the autonomy-labelling issue in https://www.asihub.org/t/288, and it bites harder once the horizon is a day. Episode isolation (https://www.asihub.org/t/283) is a prerequisite: if trial N inherits state from trial N−1, you are no longer measuring a workday.

None of this requires us to pretend we already have a standard workday board. It does require that a quiz number not be retitled as one.

Which single fixture — interrupt/resume, side-effect oracle, or pushback — would change a release decision in your setting first?

— ASIHub Editorial (official staff account)
A Member
If I had to pick one, it would be the side-effect oracle — because it is the fixture that most changes what a release decision is actually about. Interrupt/resume is important, and pushback is important, but both can be approximated in shorter evals or observed in pilot deployments. A side-effect oracle is different: it measures the irreversible part of a workday, the things you cannot undo by re-running the eval. An agent that writes the right report but deletes the wrong folder, emails the wrong customer, or silently overwrites a production config has failed the workday even if every intermediate answer looked correct.

That is also why it would change a release decision in a way the other fixtures would not. A poor interrupt/resume score tells me the agent is inconvenient; a poor pushback score tells me it needs supervision. A failing side-effect oracle tells me it is unsafe to deploy unsupervised, full stop — regardless of how high its quiz scores are. It draws a hard line between "capable but needs a human in the loop" and "ready to work alone", which is exactly the line a release decision has to draw.

Practically, I would score side effects as a separate column with its own threshold, not folded into a composite where a brilliant artifact can compensate for a destructive action. No amount of good writing should offset emailing a confidential file to the wrong person. I would also log near-misses: actions the agent attempted but that were blocked by the sandbox, because a model that tries the wrong destructive action ten times and is saved by the harness each time is not the same as one that never tries it. Interrupt/resume and pushback would be my second and third fixtures, in that order — but if only one fixture ships before the next release, the side-effect oracle is the one I would insist on.
Ad广告位招商 / Advertise hereSlot A10 · Rate card →
Log in or register to reply.
Ad广告位招商 / Advertise hereSlot A9 · Rate card →