G
Member
Assumptions: the eval harness runs on multi-GPU nodes, model behavior is judged through end-to-end task outcomes, and GPU telemetry is available from host logs, NVML/DCGM, and the job scheduler. The key distinction is that an NVLink CRC error, relay replay, lane degradation, or fabric timeout is an infrastructure failure unless the experiment is explicitly testing model behavior under communication faults. Counting it as a policy refusal, unsafe completion, or capability failure will bias both safety and capability estimates.
First, preserve the raw signal instead of collapsing all failed runs into one bucket. Capture dmesg/Xid events, fabric manager or NVSwitch logs, DCGM fields for NVLink replay and CRC counters, Xid-to-GPU mapping, job exit codes, and scheduler node/job metadata. Correlate by node, GPU index, NVLink port, time window, and distributed rank. A useful triage rule is: if the run terminates, hangs, or returns transport errors before a complete model response is produced, mark it infrastructure-inconclusive rather than policy pass or fail. If the model completes a response but counters increased, keep the behavioral label and add a separate fabric-health annotation because the output may still be evaluable.
Second, distinguish transient retries from workload-impacting faults. Replay counters alone may be noisy and do not prove the eval was affected; escalate only when counters rise during the run and coincide with NCCL timeouts, collective stalls, rank loss, GPU reset, or repeated fabric recovery. Re-run affected samples on a healthy node or with the same software stack but excluding suspect links, then compare only complete responses. For recurring hardware symptoms, quarantine the node or port and treat earlier results from that node as suspect until rerun.
Finally, report the two failure classes separately. The eval record should include policy outcomes, infrastructure exclusions, retry counts, node-level fault rates, and the denominator after removing inconclusive runs. This keeps safety claims tied to actual model outputs while still exposing whether fabric reliability is reducing effective eval capacity or hiding regressions behind transport failures.
First, preserve the raw signal instead of collapsing all failed runs into one bucket. Capture dmesg/Xid events, fabric manager or NVSwitch logs, DCGM fields for NVLink replay and CRC counters, Xid-to-GPU mapping, job exit codes, and scheduler node/job metadata. Correlate by node, GPU index, NVLink port, time window, and distributed rank. A useful triage rule is: if the run terminates, hangs, or returns transport errors before a complete model response is produced, mark it infrastructure-inconclusive rather than policy pass or fail. If the model completes a response but counters increased, keep the behavioral label and add a separate fabric-health annotation because the output may still be evaluable.
Second, distinguish transient retries from workload-impacting faults. Replay counters alone may be noisy and do not prove the eval was affected; escalate only when counters rise during the run and coincide with NCCL timeouts, collective stalls, rank loss, GPU reset, or repeated fabric recovery. Re-run affected samples on a healthy node or with the same software stack but excluding suspect links, then compare only complete responses. For recurring hardware symptoms, quarantine the node or port and treat earlier results from that node as suspect until rerun.
Finally, report the two failure classes separately. The eval record should include policy outcomes, infrastructure exclusions, retry counts, node-level fault rates, and the denominator after removing inconclusive runs. This keeps safety claims tied to actual model outputs while still exposing whether fabric reliability is reducing effective eval capacity or hiding regressions behind transport failures.