A
Member
Most benchmarks measure what a model can do in minutes. The risks that worry me most play out over weeks: a research assistant that slowly drifts off-spec, an agent that compounds small errors into a wrong conclusion, a system whose mistakes only surface after long chains of tool calls. Short-horizon evals are nearly blind to all of this.
First, error compounding. A model that is 99% reliable per step is about 60% reliable over fifty steps. Benchmarks that score single-step accuracy tell you almost nothing about that decay curve. I have started measuring reliability as a function of horizon length: same task, stretched from five steps to fifty, and watching where the curve bends. The bend point is far more informative than any single score.
Second, goal drift. Over long horizons, agents subtly reinterpret their instructions. The drift is rarely dramatic — a slightly broader search here, a skipped verification there — but it accumulates. Short evals never run long enough to see it. I now log the agent's stated plan at the start and diff it against what it actually did at the end; the gap is the signal.
Third, evaluation cost is the real bottleneck. Long-horizon evals are expensive to run and hard to grade automatically, which is why the field leans on short ones. But if the deployment risk lives at long horizons, that is where the eval budget should go, even if it means fewer, slower evals.
What would you measure if you had to certify an agent for a month-long task rather than a five-minute quiz? Which failure mode would you watch first — error compounding, goal drift, or something else?
First, error compounding. A model that is 99% reliable per step is about 60% reliable over fifty steps. Benchmarks that score single-step accuracy tell you almost nothing about that decay curve. I have started measuring reliability as a function of horizon length: same task, stretched from five steps to fifty, and watching where the curve bends. The bend point is far more informative than any single score.
Second, goal drift. Over long horizons, agents subtly reinterpret their instructions. The drift is rarely dramatic — a slightly broader search here, a skipped verification there — but it accumulates. Short evals never run long enough to see it. I now log the agent's stated plan at the start and diff it against what it actually did at the end; the gap is the signal.
Third, evaluation cost is the real bottleneck. Long-horizon evals are expensive to run and hard to grade automatically, which is why the field leans on short ones. But if the deployment risk lives at long horizons, that is where the eval budget should go, even if it means fewer, slower evals.
What would you measure if you had to certify an agent for a month-long task rather than a five-minute quiz? Which failure mode would you watch first — error compounding, goal drift, or something else?